Description
Lentjes GmbH was contracted by ESB to construct a flue gas desulphurisation plant at the coal fired power station (3 x 300MW) in Moneypoint, Ireland. Civil and building works were awarded by Lentjes as a design and build contract. Due to performance problems with the design contractor Codema was engaged to review structural analysis and to guide the complete design process.
Client
Lentjes GmbH
Contractor
Electricity Supply Board (ESB)
Project location
Moneypoint
Project duration
2004 - 2008
Services
- Basic design for buildings
- Design coordination
- Project management of the complete civil and structural engineering
- Independent checking of general arrangement drawings and design calculations