H2CO plant

In the Chempark Dormagen, a steam reformer will be installed in the E-Block on an area of approx. 16,000 m², which converts the raw material natural gas into carbon monoxide and hydrogen. As part of the Reformer III project, three buildings, three process units and three pipe bridges are planned in addition to the technical system of the reformer. The contract includes the technical planning of the building physics and the technical building equipment of the following three buildings.

Client / Contractor: Codema International GmbH Air Liquide Deutschland GmbH
Project location: Dormagen
Project duration: 2012
Codema Services:
  • Sectoral planning building physics: advice on building physics and proof of compliance with the Energy Saving Ordinance 2009
  • Technical building services planning: air handling systems, heavy current and telecommunications and information systems