Contract Awarding Glückstein Allee

Within the infrastructural measures of the overall measure Glückstein-Quartier in Mannheim-Lindenhof, Codema rendered engineering services in design and execution of inner-local (municipal) roads. The release of the former railway areas and the relocation of the southern tangent to a location parallel to the railway - from the Viktoria Tower to the confluence with the Fahrlachtunnel - resulted in construction areas which were developed by means of an inner-local "Glückstein Allee" development axis.

Client / Contractor: City of Mannheim
Project location: Mannheim
Project duration: 2012
Codema Services:
  • Execution of a VOF process for allocating the design of the engineering services based on §46 ff. HOAI