New construction of a Cainite-Crystallization and Flotation-Plant

K+S KALI GmbH built an evaporation construction with a connected preparation in the plant Werra, Hattorf. The so-called Cainite-Crystallization and Flotation Plant.

Codema was instructed with the project management services for the new construction of the KKF/CCF-plant including the reconstruction of the power plant Hattorf, side plants and connecting infrastructure as well as the commissioning phase.

Client / Contractor: K+S KALI GmbH
Project location: Hattorf
Project duration: 2015 - 2018
Codema Services:
  • Project management based on AHO